On the modules next to Cretaz station I installed poles made as already described in the post http://cretaz-station.blogspot.com/2007/11/poles-palificazione.html . For the overhead catenary, rather than using tin-welded steel wire, I try the technique described on TTM38, gluing an elastic wire (dia. 0.2 mm), produced by SBM ( http://www.essebiemme.net/ ). In a couple of evenings, I have completed 1.5 m of track.
On the form next to the station Cretaz I installed the catenary, made as already described in the post http://cretaz-station.blogspot.com/2007/11/poles-palificazione.html . For the realization of overhead wire instead of using the subtle harmonic steel welded to the pond, I tested the technique on TTM38, pasting that is an elastic thread with a diameter of 0.2 mm, produced by SBM ( http://www.essebiemme . net / ). In a couple of evenings, I have completed 1.5 m of track.
0 comments:
Post a Comment